Short answer. Yes. In Coquitlam you need a Sign Permit before placing or altering a sign on the outside of any building or structure, or on any property. This applies to permanent and time-limited signs.
What needs a permit
- A Sign Permit is required before placing or altering any exterior sign, permanent or time-limited.
- New canopy or awning signs also need a Building Permit.
- Applications are reviewed against the Sign Bylaw and, where they apply, the Urban Design Guidelines.
Key rules
- Drawings and context must be submitted in metric units.
- The sign contractor or installer must provide a business licence number.
- Signs installed without a permit must be permitted or removed.
How to apply
- Submit the Sign Permit Application Form and Checklist with the documents it lists.
- Once approved, staff email an invoice with payment instructions. Fees follow the Sign Permit Consolidated Fee Schedule and are based on the sign's installed value. Fees are non-refundable.
- Questions: 604-927-3430 or the City's sign permits email.
Lit signs and electrical approval
The City of Coquitlam sign permit covers size, placement and appearance. Electrical safety is a separate approval. In BC, the Electrical Safety Regulation does not allow electrical equipment to be used or sold unless it carries an accredited certification mark. For an electric sign the Canadian standard is CSA C22.2 No. 207, and the mark goes on the finished sign. The connection is made by a licensed electrician under an electrical permit. More in our guide to cUL certified signs.
Sources
This page summarizes official City of Coquitlam sources. Bylaws and fees change, so confirm with the municipality before you order or install a sign.
