Short answer. Yes. Surrey requires a sign permit for any new sign and to reface an existing sign, including fascia, freestanding, awning and canopy signs.
What needs a permit
- A sign permit is required for any new sign or to reface an existing sign.
- A new freestanding sign also needs a Development Permit.
- A new awning or canopy, or a new tenant in a space, may also need a Building Permit.
- A proposal that exceeds the Sign By-law needs a Development Variance Permit.
Key rules
- Signed and sealed structural drawings by a Registered Professional are required for fascia signs over 68 kg (150 lbs), freestanding signs over 2.5 m (8 ft 2 in) tall, awning and canopy signs, and complex signs.
- A final inspection is required once the sign and related work, including electrical, are complete.
- A sign permit does not authorize the business to operate. You also need the tenant improvement building permit final and a business licence.
How to apply
- Apply online through the City's permit portal with a MySurrey account, or by email following the Digital Submission Guide. Incomplete submissions are not accepted.
- Documents: Sign Permit Application Form and Checklist, Owner Authorization Form, Structural Schedule B and insurance certificate if applicable, and a Bylaw and Licensing Inquiry Form or active business licence.
- Drawings (two sets): site plan, elevation drawing or photo, copy drawing, cross section, and a photo of the building face showing existing signs.
- The permit fee is based on total sign area. A non-refundable processing fee is due when you apply and is credited to the total fee.
Lit signs and electrical approval
The City of Surrey sign permit covers size, placement and appearance. Electrical safety is a separate approval. In BC, the Electrical Safety Regulation does not allow electrical equipment to be used or sold unless it carries an accredited certification mark. For an electric sign the Canadian standard is CSA C22.2 No. 207, and the mark goes on the finished sign. The connection is made by a licensed electrician under an electrical permit. More in our guide to cUL certified signs.
Sources
This page summarizes official City of Surrey sources. Bylaws and fees change, so confirm with the municipality before you order or install a sign.
