Get a quote

Sign permits in Victoria

City of Victoria, Vancouver Island. Governing rules: Sign Bylaw No. 14-097.

Checked November 2026

Short answer. Yes. In the City of Victoria you must get a Sign Permit before starting work on a sign project or erecting a sign. Signs that do not meet the Sign Bylaw need a Development Variance Permit.

What needs a permit

  • A Sign Permit is required before starting work on a sign or erecting a sign.
  • A sign that does not comply with the Sign Bylaw needs a Development Variance Permit.

Key rules

  • Projecting and freestanding signs need a professional engineer's confirmation of structural capacity.
  • Size, siting and location should follow the design guidelines in the Official Community Plan. The City publishes a Sign Zone Map.

How to apply

  • Email the Sign Permit Application (and the extra sheet for signs 3 to 9) to [email protected]. If you cannot apply by email, call 250-361-0344.
  • Fees are set in the City's fee schedule.
  • Design guideline questions: [email protected].

Lit signs and electrical approval

The City of Victoria sign permit covers size, placement and appearance. Electrical safety is a separate approval. In BC, the Electrical Safety Regulation does not allow electrical equipment to be used or sold unless it carries an accredited certification mark. For an electric sign the Canadian standard is CSA C22.2 No. 207, and the mark goes on the finished sign. The connection is made by a licensed electrician under an electrical permit. More in our guide to cUL certified signs.

Sources

This page summarizes official City of Victoria sources. Bylaws and fees change, so confirm with the municipality before you order or install a sign.